The wife and I spent the 3 day weekend (President’s Day) slaving over the tiles. Inevitably things took at least 3 times longer to finish than we planned. However, we’re pretty happy with the results.
The only really bad part about the process is that I didn’t count the floor tiles that were shipped to us. The bathroom floor is 8 by 4 feet, so 32 square feet of tile is needed. I ordered 36 to leave ensure there was extra, but as you can see from the pictures, it didn’t quite make it. An extra 6 square feet is in the mail as we speak, so hopefully it will be finished soon. I don’t know if they didn’t send us the right amount, or if we wasted a bunch on cut pieces.
Next up… grouting, painting, trim work, and some others before we can use it!
- The before pic.
- Cement board with shower niche ready to go.
- Kerdi water-proofing on the whole area.
- first wall down… only took 4 hours 🙁
- We had a little helper come join us.
- After pic… well almost after.
- Rough electrical is in and most of the tile is done.
- All that is left is grout and caulk.